Mayes Ward Dobbins Funeral Home – Macland Campus

Mayes WardThis project is for the construction of a 22,000 sf steel and woos frame funeral home.  The roof system is wood trusses with a TPO roof membrane. The interior is very nicely finished with high end commercial grade wood trim and decorations. The exterior is a brick veneer with highly detailed exterior finish, such as brick paver porches and Corinthian column capitals.

Project Completion: July 2012

Project Duration: 14 Months

West Ridge Church

DCIM100MEDIADJI_0012.JPGThis project is a two story, 95,000 square foot combination slab on grade and composite slab building. The building is a combination education, office, and Sanctuary. The building structure is structural steel frame with metal stud wall framing. The building has a 2,000 seat auditorium, larger multi-level circulation foyer, multiple classrooms with large hallways. This facility is heavy with electrical and data provisions for theatrical lighting, sound systems, and data involvement in the services and child management. The exterior finishes consisted of a combination multi-level surface and color variation E.I.F.S. This project included 17 acres of site development inclusive of curb & gutter, paving, utilities, landscaping, etc.

Project Completion: 2006

Project Duration: 15 months